Drivers are being warned of overnight closures on the M25 this week, with multiple junctions affected from Monday.
National Highways has confirmed the closures, which will affect both carriageways and slip roads between 10pm and 5.30am.
On Monday, March 23, the clockwise carriageway between junctions 11 and 13, as well as between junctions 8 and 9, will be closed.
Entry and exit slip roads at junctions 8 and 28 will also be shut.
Anti-clockwise traffic will face closures between junctions 15 and 14, and the entry slip road at junction 25 will be closed.
A clockwise closure will also be in place at junction 10 between the exit and entry slip roads.
READ MORE:
- New speed cameras to be installed across London in dangerous driving crackdown
- Easy escapes for Londoners to try via the M25
- Happy Spring London walks to brighten up your mood
Tuesday, March 24, will see similar restrictions, with additional works between junctions 22 and 23.
Wednesday, March 25, will have ongoing works across the same junctions, with junction 23 having both entry and exit slip roads shut anti-clockwise.
Thursday, March 26, will see an increase in closures.
In addition to ongoing works, drivers will face disruption between junctions 30 and 31, at junction 28 with an "up and over" carriageway closure, and at junction 14 with an exit slip closure.
There will also be closures on the link roads between junction 7 and the M23 in both directions.
All closures are scheduled overnight from 10pm to 5.30am each day, though drivers are advised that timings may change at short notice.
Motorists are encouraged to plan ahead, allow extra time for journeys, and follow diversion routes where necessary.
Share